久久精品国产亚洲AV天海翼_免费看国产曰批40分钟_国产微拍精品一区二区_亚洲国产欧美日韩精品一区二区三区

Strengthening

Location:Home>Strengthening

Structure monitoring system of Chongqing Nanji Gate rail bridge
2024-07-04 11:32:00

 Nanji Gate Rail Bridge is the first large-scale use of steel spring floating plate ballast in China. When the train passes over the bridge at high speed, the integral ballast of the steel spring floating plate can not only reduce the noise of the train, but also reduce the vibration of the bridge floor. The monitoring system monitors the vibration, main beam stress and environmental load of the bridge in real time.  


111.jpg 

Chongqing Nanji Gate rail bridge

久久精品国产亚洲AV天海翼_免费看国产曰批40分钟_国产微拍精品一区二区_亚洲国产欧美日韩精品一区二区三区